Become the mainstream direction of the industry
Pay attention to industry development, national policies, our trends

[National policy]Ministry of Housing and Urban-Rural Development: Fully impleme

浏览: 时间:2021-01-06 分类:National policy

Xinhua News Agency, Shanghai, November 19, 2016 (Reporter Wang Youling and Zheng Juntian) Chen Zhenggao, Minister of Housing and Urban-Rural Development, said on the 19th that prefabricated buildings are a major change in construction methods. The development goals and key tasks of prefabricated buildings must be fully implemented, and assembly will be fully formed. Building technical standards.

Chen Zhenggao said at the National Prefabricated Building Worksite Meeting in Shanghai that it is necessary to speed up the formation of a complete set of prefabricated building standard systems and speed up the formulation of technical regulations for the three major structural systems of prefabricated concrete structures, steel structures and modern wooden structures. At the same time, we must increase the construction of basic industries. All localities should take into account the local reality and the development of surrounding areas to accelerate the cultivation of leading enterprises and key enterprises in the industrial chain that can integrate design, production, and construction.

The "Several Opinions on Further Strengthening the Management of Urban Planning and Construction" issued at the beginning of this year proposed the construction of a national-level prefabricated construction production base. Increase policy support, and strive to use about 10 years to make prefabricated buildings account for 30% of new buildings.

In terms of further increasing policy support, Chen Zhenggao said that all localities must implement relevant preferential policies for manufacturers of prefabricated construction parts. Encourage all localities to introduce supporting policies and measures in terms of finance, banking, taxation, planning, land, etc., to guide and support social capital to invest in prefabricated buildings.

In terms of promoting the innovation of the management system of the construction industry, Chen Zhenggao said that it is necessary to adapt to the development of prefabricated buildings, and promote the reform of the management system in the aspects of survey and design, production of parts and components, project cost, bidding, construction organization, and quality supervision. Vigorously promote the general contracting of projects to realize the unified management and deep integration of engineering design, parts and components production, construction and procurement.

According to reports, Shanghai's prefabricated buildings have made positive progress. In 2016, the city has implemented 13.85 million square meters of prefabricated buildings, which has doubled for two consecutive years. The number of prefabricated component manufacturers has reached 41, and the production capacity has exceeded 12 million square meters.